STEEL GEMS — SA-240 / SA-182 PURCHASER CHECKLIST Educational receiving and RFQ aid; not an engineering approval. PO / item: __________ Supplier: __________ Drawing / revision: __________ [ ] Exact specification, grade and required edition match the PO. [ ] Product form and manufacturing route are permitted by the governing component standard and project. [ ] Required heat treatment is documented. [ ] Required chemistry, mechanical results, units and supplementary tests are reviewed. [ ] Heat number / markings link to certificates and manufacturing records. [ ] Finished flange type, size, class/PN, facing, bore, dimensions and marking match. [ ] Certificate type, inspection scope and deviation approvals are agreed. Questions: Does the offer claim full compliance or dimensions only? Does the material certificate cover starting stock only or the required finished component evidence? ASTM A and ASME SA adoption / edition requirements checked: __________ Reviewer: __________ Date: __________ Open clarifications: __________ Final acceptance follows approved design, applicable standards and project requirements. Steel Gems | sales@steel-gems.com | +91 9619926607 https://connect.steel-gems.com/knowledge-centre/sa240-vs-sa182